Market Notices
NEM POWER SYSTEM EVENTS #144812

Non-credible contingency event - QLD region - 18/08/2026

Original (nemweb.com.au) AEMO listing
AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - QLD region - 18/08/2026

At 1332 hrs the R2 Braemar No.1 275 kV Busbar tripped.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.

Manager NEM Real Time Operations