NEM
coalgashydrobattery dischargewindsolar utilitysolar rooftopBattery (charge) coalgashydrobattery dischargewindsolar utilitysolar rooftopBattery (charge) coalgashydrobattery dischargewindsolar utilitysolar rooftopBattery (charge) gasbattery dischargewindsolar utilitysolar rooftopBattery (charge) hydrowindsolar rooftop
NEM
Daily analysis
Sunday 19 April 2026
Trading day 2026-04-19
Prices
Trading day · 04:00 → 04:00 AEST
NSW VIC QLD SA TAS
| Region | Avg | VWAP | Min | Max | Neg | Cap |
|---|---|---|---|---|---|---|
| NSW | $58 | $67 | -$6 | $125 | 12 | 0 |
| QLD | $47 | $54 | -$9 | $111 | 16 | 0 |
| SA | $76 | $87 | -$5 | $262 | 12 | 0 |
| VIC | $65 | $75 | -$6 | $243 | 12 | 0 |
| TAS | $98 | $99 | $65 | $213 | 0 | 0 |
Demand
NSW
Peak
8,524MW
18:20
Trough
3,734MW
12:20
Energy
301.0GWh
QLD
Peak
7,794MW
18:00
Trough
3,750MW
10:50
Energy
273.0GWh
SA
Peak
1,554MW
18:55
Trough
447MW
14:35
Energy
55.1GWh
VIC
Peak
6,220MW
18:40
Trough
2,707MW
13:00
Energy
219.1GWh
TAS
Peak
1,321MW
18:25
Trough
936MW
13:35
Energy
52.4GWh
Generation Mix
- Coal60.7% · 111.6 GWh
- Gas0.6% · 1.0 GWh
- Hydro4.4% · 8.0 GWh
- Wind2.5% · 4.6 GWh
- Solar (utility)13.5% · 24.9 GWh
- Solar (rooftop)16.9% · 31.0 GWh
- Battery1.5% · 2.8 GWh
- Coal60.5% · 118.4 GWh
- Gas2.3% · 4.5 GWh
- Hydro5.0% · 9.7 GWh
- Wind7.1% · 13.9 GWh
- Solar (utility)9.9% · 19.3 GWh
- Solar (rooftop)13.8% · 27.0 GWh
- Battery1.5% · 3.0 GWh
- Coal67.3% · 96.1 GWh
- Gas0.1% · 0.1 GWh
- Hydro6.2% · 8.9 GWh
- Wind7.4% · 10.6 GWh
- Solar (utility)5.2% · 7.5 GWh
- Solar (rooftop)12.5% · 17.9 GWh
- Battery1.2% · 1.8 GWh
- Gas16.0% · 5.2 GWh
- Wind56.2% · 18.4 GWh
- Solar (utility)5.0% · 1.6 GWh
- Solar (rooftop)20.8% · 6.8 GWh
- Battery2.0% · 0.7 GWh
- Hydro91.7% · 25.9 GWh
- Wind4.1% · 1.2 GWh
- Solar (rooftop)4.2% · 1.2 GWh
Renewables
NSW · Daily renewable share
21.2%
VIC · Daily renewable share
24.2%
QLD · Daily renewable share
30.9%
SA · Daily renewable share
69.5%
TAS · Daily renewable share
96.5%
Peak instantaneous
56.4%
at 09:05
Daily NEM-wide share
33.2%
By region (daily share)
- NSW 21.2%
- VIC 24.2%
- QLD 30.9%
- SA 69.5%
- TAS 96.5%
FCAS
| Service | Cost | Spikes | Peak | When |
|---|---|---|---|---|
| RAISEREG | $9,892 | 0 | $20 | 19 Apr, 17:05 |
| LOWERREG | $4,076 | 0 | $13 | 19 Apr, 07:00 |
| RAISE60SEC | $1,052 | 0 | $0 | 19 Apr, 17:05 |
| RAISE6SEC | $483 | 0 | $0 | 19 Apr, 07:25 |
| RAISE5MIN | $117 | 0 | $0 | 19 Apr, 07:25 |
| LOWER60SEC | $23 | 0 | $0 | 19 Apr, 14:20 |
| LOWER5MIN | $6 | 0 | $0 | 19 Apr, 15:25 |
| LOWER6SEC | $4 | 0 | $0 | 19 Apr, 14:10 |
| Total | $15,653 | |||
Cost = NSW RRP × cleared MW per 5-min interval.
| Service | Cost | Spikes | Peak | When |
|---|---|---|---|---|
| LOWER6SEC | $36,549 | 0 | $10 | 19 Apr, 17:50 |
| LOWER60SEC | $35,807 | 0 | $10 | 19 Apr, 17:50 |
| RAISEREG | $9,684 | 0 | $20 | 19 Apr, 17:05 |
| LOWER5MIN | $7,992 | 0 | $2 | 20 Apr, 01:05 |
| LOWERREG | $5,454 | 0 | $13 | 19 Apr, 07:00 |
| RAISE6SEC | $99 | 0 | $0 | 19 Apr, 18:40 |
| RAISE5MIN | $52 | 0 | $0 | 19 Apr, 19:15 |
| RAISE60SEC | $44 | 0 | $0 | 19 Apr, 19:10 |
| Total | $95,681 | |||
Cost = QLD RRP × cleared MW per 5-min interval.
| Service | Cost | Spikes | Peak | When |
|---|---|---|---|---|
| RAISEREG | $14,231 | 0 | $20 | 19 Apr, 17:05 |
| LOWERREG | $6,947 | 0 | $13 | 19 Apr, 07:00 |
| RAISE60SEC | $1,602 | 0 | $0 | 19 Apr, 17:05 |
| RAISE6SEC | $952 | 0 | $0 | 19 Apr, 07:25 |
| RAISE5MIN | $207 | 0 | $0 | 19 Apr, 07:25 |
| LOWER60SEC | $158 | 0 | $0 | 19 Apr, 14:20 |
| LOWER5MIN | $27 | 0 | $0 | 19 Apr, 15:25 |
| LOWER6SEC | $11 | 0 | $0 | 19 Apr, 14:10 |
| Total | $24,135 | |||
Cost = VIC RRP × cleared MW per 5-min interval.
| Service | Cost | Spikes | Peak | When |
|---|---|---|---|---|
| RAISEREG | $6,657 | 0 | $20 | 19 Apr, 17:05 |
| LOWERREG | $4,460 | 0 | $13 | 19 Apr, 07:00 |
| RAISE60SEC | $502 | 0 | $0 | 19 Apr, 17:05 |
| RAISE6SEC | $282 | 0 | $0 | 19 Apr, 07:25 |
| LOWER60SEC | $71 | 0 | $0 | 19 Apr, 14:20 |
| RAISE5MIN | $63 | 0 | $0 | 19 Apr, 07:25 |
| LOWER5MIN | $13 | 0 | $0 | 19 Apr, 15:25 |
| LOWER6SEC | $6 | 0 | $0 | 19 Apr, 14:10 |
| Total | $12,053 | |||
Cost = SA RRP × cleared MW per 5-min interval.
| Service | Cost | Spikes | Peak | When |
|---|---|---|---|---|
| RAISEREG | $14,484 | 0 | $91 | 19 Apr, 18:40 |
| LOWER6SEC | $8,156 | 0 | $3 | 19 Apr, 04:20 |
| LOWERREG | $5,738 | 0 | $3 | 20 Apr, 02:55 |
| RAISE6SEC | $2,462 | 0 | $36 | 19 Apr, 17:55 |
| RAISE60SEC | $1,752 | 0 | $8 | 19 Apr, 20:35 |
| LOWER60SEC | $1,257 | 0 | $1 | 19 Apr, 16:25 |
| RAISE5MIN | $227 | 0 | $0 | 19 Apr, 17:45 |
| LOWER5MIN | $197 | 0 | $3 | 19 Apr, 16:25 |
| Total | $34,273 | |||
Cost = TAS RRP × cleared MW per 5-min interval.
Battery dispatch
Discharged
2,757MWh
peak 767 MW · 18:30
Charged
3,875MWh
peak 846 MW
Net
-1,118MWh
discharge − charge
Round-trip
71%
discharge / charge ratio
Discharged
2,979MWh
peak 934 MW · 18:30
Charged
4,312MWh
peak 793 MW
Net
-1,333MWh
discharge − charge
Round-trip
69%
discharge / charge ratio
Discharged
1,773MWh
peak 516 MW · 19:00
Charged
3,410MWh
peak 796 MW
Net
-1,636MWh
discharge − charge
Round-trip
52%
discharge / charge ratio
Discharged
658MWh
peak 219 MW · 18:30
Charged
1,856MWh
peak 470 MW
Net
-1,198MWh
discharge − charge
Round-trip
35%
discharge / charge ratio
NEM-wide
Discharged
8,168MWh
peak 2,316 MW · 18:30
Charged
13,452MWh
peak 2,217 MW
Net
-5,285MWh
discharge − charge
Round-trip
61%
discharge / charge ratio
Interconnectors
| Region (proxy) | Net flow | Direction changes | Hours at limit |
|---|---|---|---|
| N-Q-MNSP1 | +31.3 GWh | 0 | — |
| NSW1-QLD1 | −27.8 GWh | 0 | — |
| VIC1-NSW1 | +13.9 GWh | 16 | — |
| V-SA | −12.2 GWh | 18 | — |
| T-V-MNSP1 | −1.9 GWh | 0 | — |
Per-region net of NETINTERCHANGE proxied to a representative interconnector. Full per-interconnector decomposition + hours-at-limit needs DINTERCONNECTOR parsing (follow-up).
Emissions
Total emissions
317.7k tCO₂
▲ 22.0% vs same day last week
Intensity by region
| NSW | 98.7k tCO₂ | 0.544 tCO₂/MWh |
| QLD | 104.9k tCO₂ | 0.543 tCO₂/MWh |
| SA | 2.6k tCO₂ | 0.081 tCO₂/MWh |
| VIC | 111.4k tCO₂ | 0.795 tCO₂/MWh |
| TAS | 0 tCO₂ | 0.000 tCO₂/MWh |