Wednesday 2 September 2026
Trading day 2026-09-02
Regional prices converge as renewable generation peaks at seventy-three percent
Average regional prices were tightly clustered between $35.00/MWh in Tasmania and $45.90/MWh in New South Wales. Queensland and New South Wales experienced significant price volatility with 140 and 130 negative intervals respectively during daylight hours.
Demand peaked across all regions between 18:20 and 18:55, led by New South Wales at 8,786 MW. Total energy consumption for the day reached 963.7 GWh across the five regions.
Renewable generation achieved an instantaneous peak of 73.3% at 13:10, supported by a 17.4% wind contribution. Coal maintained a 48% share of the total mix while gas generation remained minimal at 1.3%.
Battery storage dispatched 19,536 MWh to the grid, representing 3.1% of the total generation mix. Total emissions of 295,441 tonnes of CO2 reflected a 19.8% decrease compared to the same day last week.
Today · Forward projections indicate a price peak of $319.04/MWh in Queensland at 19:30, with other regions remaining below $150/MWh.
Why it matters · The daily average of $47.90/MWh sits 29% below the weekly average, continuing a downward trend from the $104.10/MWh peak six days ago. This price softening coincides with a high 48% renewable share and a significant 19.8% reduction in emissions relative to the prior week.
Prices
Trading day · 04:00 → 04:00 AEST · 30-min average
| Region | Avg | VWAP | Min | Max | Neg | Cap |
|---|---|---|---|---|---|---|
| NSW | $46 | $50 | -$9 | $98 | 130 | 0 |
| QLD | $44 | $51 | -$8 | $93 | 140 | 0 |
| SA | $45 | $49 | -$4 | $110 | 20 | 0 |
| VIC | $36 | $40 | -$5 | $107 | 36 | 0 |
| TAS | $35 | $37 | -$5 | $100 | 26 | 0 |
Min · Max are 5-minute dispatch extremes; the price chart plots 30-minute averages, so its peak reads lower.
Demand
FCAS
| Service | Cost | Spikes | Peak | When |
|---|---|---|---|---|
| RAISEREG | $2,464 | 0 | $20 | 2 Sept, 15:35 |
| LOWERREG | $419 | 0 | $7 | 2 Sept, 07:30 |
| LOWER60SEC | $243 | 0 | $1 | 2 Sept, 15:00 |
| RAISE6SEC | $185 | 0 | $0 | 2 Sept, 06:35 |
| LOWER6SEC | $137 | 0 | $0 | 2 Sept, 14:00 |
| RAISE60SEC | $117 | 0 | $0 | 2 Sept, 06:35 |
| LOWER5MIN | $79 | 0 | $0 | 2 Sept, 15:45 |
| RAISE5MIN | $28 | 0 | $0 | 2 Sept, 06:35 |
| Total | $3,673 | |||
Cost = NSW RRP × cleared MW per 5-min interval.
| Service | Cost | Spikes | Peak | When |
|---|---|---|---|---|
| RAISEREG | $9,622 | 0 | $20 | 2 Sept, 15:35 |
| LOWERREG | $3,801 | 0 | $7 | 2 Sept, 07:30 |
| LOWER60SEC | $656 | 0 | $1 | 2 Sept, 15:00 |
| RAISE6SEC | $515 | 0 | $0 | 2 Sept, 06:35 |
| LOWER6SEC | $399 | 0 | $0 | 2 Sept, 14:00 |
| RAISE60SEC | $365 | 0 | $0 | 2 Sept, 06:35 |
| LOWER5MIN | $173 | 0 | $0 | 2 Sept, 15:45 |
| RAISE5MIN | $58 | 0 | $0 | 2 Sept, 06:35 |
| Total | $15,590 | |||
Cost = QLD RRP × cleared MW per 5-min interval.
| Service | Cost | Spikes | Peak | When |
|---|---|---|---|---|
| RAISEREG | $10,836 | 0 | $20 | 2 Sept, 15:35 |
| LOWERREG | $2,666 | 0 | $7 | 2 Sept, 07:30 |
| LOWER60SEC | $415 | 0 | $1 | 2 Sept, 15:00 |
| RAISE6SEC | $408 | 0 | $0 | 2 Sept, 06:35 |
| RAISE60SEC | $375 | 0 | $0 | 2 Sept, 06:35 |
| LOWER6SEC | $324 | 0 | $0 | 2 Sept, 14:00 |
| RAISE5MIN | $97 | 0 | $0 | 2 Sept, 06:35 |
| LOWER5MIN | $86 | 0 | $0 | 2 Sept, 15:45 |
| Total | $15,206 | |||
Cost = VIC RRP × cleared MW per 5-min interval.
| Service | Cost | Spikes | Peak | When |
|---|---|---|---|---|
| RAISEREG | $4,497 | 0 | $20 | 2 Sept, 15:35 |
| LOWERREG | $3,074 | 0 | $7 | 2 Sept, 07:30 |
| LOWER60SEC | $521 | 0 | $1 | 2 Sept, 15:00 |
| RAISE6SEC | $370 | 0 | $0 | 2 Sept, 06:35 |
| LOWER6SEC | $332 | 0 | $0 | 2 Sept, 14:00 |
| RAISE60SEC | $271 | 0 | $0 | 2 Sept, 06:35 |
| LOWER5MIN | $111 | 0 | $0 | 2 Sept, 15:45 |
| RAISE5MIN | $58 | 0 | $0 | 2 Sept, 06:35 |
| Total | $9,234 | |||
Cost = SA RRP × cleared MW per 5-min interval.
| Service | Cost | Spikes | Peak | When |
|---|---|---|---|---|
| LOWERREG | $23,758 | 0 | $62 | 3 Sept, 03:00 |
| RAISEREG | $9,121 | 0 | $5 | 2 Sept, 09:05 |
| LOWER6SEC | $2,705 | 0 | $113 | 2 Sept, 09:15 |
| RAISE6SEC | $1,174 | 0 | $6 | 2 Sept, 23:25 |
| RAISE60SEC | $811 | 0 | $3 | 2 Sept, 08:35 |
| LOWER60SEC | $90 | 0 | $1 | 2 Sept, 15:00 |
| RAISE5MIN | $57 | 0 | $0 | 2 Sept, 08:05 |
| LOWER5MIN | $1 | 0 | $0 | 2 Sept, 15:45 |
| Total | $37,717 | |||
Cost = TAS RRP × cleared MW per 5-min interval.
Battery dispatch
Peak moment
Fleet discharged 1,076 MW at 18:30 as NSW spot hit $83/MWh.
Peak moment
Fleet discharged 1,277 MW at 18:30 as QLD spot hit $83/MWh.
Peak moment
Fleet discharged 1,001 MW at 19:00 as VIC spot hit $77/MWh.
Peak moment
Fleet discharged 393 MW at 19:00 as SA spot hit $85/MWh.
Peak moment
Fleet discharged 3,670 MW at 18:30 as TAS spot hit $72/MWh.
Fleet net dispatch · spot-price overlay · 30-min average
Regional dispatch ranking
| Region | Discharged | Net |
|---|---|---|
#1VIC | 7,077MWh | +2,868 |
#2QLD | 5,589MWh | -764 |
#3NSW | 4,540MWh | -439 |
#4SA | 2,331MWh | +464 |
Generation Mix
- Coal48.9% · 100.9 GWh
- Gas0.5% · 1.1 GWh
- Hydro3.3% · 6.7 GWh
- Wind16.5% · 34.0 GWh
- Solar (utility)13.1% · 27.0 GWh
- Solar (rooftop)15.3% · 31.5 GWh
- Battery2.2% · 4.5 GWh
- Other0.3% · 0.5 GWh
- Coal57.3% · 109.9 GWh
- Gas1.5% · 2.8 GWh
- Hydro2.2% · 4.1 GWh
- Wind6.4% · 12.3 GWh
- Solar (utility)11.8% · 22.6 GWh
- Solar (rooftop)17.7% · 33.9 GWh
- Battery2.9% · 5.6 GWh
- Other0.4% · 0.7 GWh
- Coal54.8% · 90.1 GWh
- Hydro2.2% · 3.7 GWh
- Wind22.5% · 37.0 GWh
- Solar (utility)4.5% · 7.4 GWh
- Solar (rooftop)9.8% · 16.1 GWh
- Battery4.3% · 7.1 GWh
- Other1.7% · 2.9 GWh
- Gas13.5% · 4.5 GWh
- Wind46.3% · 15.4 GWh
- Solar (utility)8.5% · 2.8 GWh
- Solar (rooftop)23.3% · 7.8 GWh
- Battery7.0% · 2.3 GWh
- Other1.4% · 0.5 GWh
- Hydro62.9% · 19.6 GWh
- Wind33.8% · 10.5 GWh
- Solar (rooftop)3.4% · 1.1 GWh
Renewables
- NSW 47.0%
- VIC 46.9%
- QLD 44.5%
- SA 67.5%
- TAS 106.5%
Interconnectors
| Region (proxy) | Net flow | Direction changes | Hours at limit |
|---|---|---|---|
| N-Q-MNSP1 | +18.5 GWh | 10 | — |
| NSW1-QLD1 | −23.0 GWh | 14 | — |
| VIC1-NSW1 | +20.1 GWh | 14 | — |
| V-SA | −10.4 GWh | 3 | — |
| T-V-MNSP1 | −1.6 GWh | 0 | — |
Per-region net of NETINTERCHANGE proxied to a representative interconnector. Full per-interconnector decomposition + hours-at-limit needs DINTERCONNECTOR parsing (follow-up).
Emissions
| NSW | 88.3k tCO₂ | 0.425 tCO₂/MWh |
| QLD | 97.5k tCO₂ | 0.500 tCO₂/MWh |
| SA | 2.4k tCO₂ | 0.069 tCO₂/MWh |
| VIC | 107.2k tCO₂ | 0.648 tCO₂/MWh |
| TAS | 0 tCO₂ | 0.000 tCO₂/MWh |