NEM
INTER-REGIONAL TRANSFER
#144217
Inter-regional transfer limit variation - Kerang - Koorangie 220 kV Line - VIC region - 09/06/2026
AEMO ELECTRICITY MARKET NOTICE Inter-regional transfer limit variation - Kerang - Koorangie 220 kV Line - VIC region - 09/06/2026 At 1325 hrs 09/06/2026 there was an unplanned outage of Kerang - Koorangie 220 kV Line. The following constraint set(s) invoked at 1330 hrs 09/06/2026 V-KGKO This constraint set(s) contains equations with the following interconnectors on the LHS. V-S-MNSP1,T-V-MNSP1,V-SA,VIC1-NSW1 Refer to the AEMO Network Outage Scheduler for further information. Manager NEM Real Time Operations