NEM
coalgashydrobattery dischargewindsolar utilitysolar rooftopotherBattery (charge) coalgashydrobattery dischargewindsolar utilitysolar rooftopBattery (charge) coalgashydrobattery dischargewindsolar utilitysolar rooftopBattery (charge) gasbattery dischargewindsolar utilitysolar rooftopBattery (charge) gashydrowindsolar rooftop
NEM
Daily analysis
Thursday 14 May 2026
Trading day 2026-05-14
Prices
Trading day · 04:00 → 04:00 AEST
NSW VIC QLD SA TAS
| Region | Avg | VWAP | Min | Max | Neg | Cap |
|---|---|---|---|---|---|---|
| NSW | $80 | $83 | $13 | $218 | 0 | 0 |
| QLD | $88 | $91 | $0 | $233 | 0 | 0 |
| SA | $70 | $74 | $9 | $273 | 0 | 0 |
| VIC | $72 | $76 | $12 | $277 | 0 | 0 |
| TAS | $104 | $104 | $62 | $244 | 0 | 0 |
Demand
NSW
Peak
9,395MW
18:25
Trough
6,592MW
03:35
Energy
367.4GWh
QLD
Peak
7,793MW
17:55
Trough
5,272MW
10:50
Energy
301.2GWh
SA
Peak
1,734MW
18:30
Trough
586MW
13:00
Energy
61.7GWh
VIC
Peak
6,732MW
07:40
Trough
4,235MW
04:00
Energy
254.5GWh
TAS
Peak
1,338MW
17:55
Trough
912MW
04:10
Energy
53.8GWh
Generation Mix
- Coal61.4% · 124.0 GWh
- Gas0.9% · 1.9 GWh
- Hydro1.2% · 2.5 GWh
- Wind14.3% · 28.9 GWh
- Solar (utility)10.6% · 21.4 GWh
- Solar (rooftop)9.4% · 19.1 GWh
- Battery2.0% · 4.1 GWh
- Other0.1% · 0.1 GWh
- Coal55.2% · 100.2 GWh
- Gas4.9% · 8.8 GWh
- Hydro2.5% · 4.6 GWh
- Wind17.0% · 30.8 GWh
- Solar (utility)8.5% · 15.4 GWh
- Solar (rooftop)9.7% · 17.7 GWh
- Battery2.2% · 4.0 GWh
- Coal60.9% · 97.1 GWh
- Gas1.6% · 2.5 GWh
- Hydro7.7% · 12.2 GWh
- Wind16.1% · 25.8 GWh
- Solar (utility)4.0% · 6.3 GWh
- Solar (rooftop)7.9% · 12.6 GWh
- Battery1.9% · 3.0 GWh
- Gas17.0% · 6.8 GWh
- Wind56.8% · 22.6 GWh
- Solar (utility)5.9% · 2.3 GWh
- Solar (rooftop)17.6% · 7.0 GWh
- Battery2.7% · 1.1 GWh
- Gas0.6% · 0.2 GWh
- Hydro84.9% · 25.2 GWh
- Wind12.5% · 3.7 GWh
- Solar (rooftop)2.0% · 0.6 GWh
Renewables
NSW · Daily renewable share
29.4%
VIC · Daily renewable share
34.2%
QLD · Daily renewable share
34.3%
SA · Daily renewable share
78.8%
TAS · Daily renewable share
98.2%
Peak instantaneous
54.5%
at 09:50
Daily NEM-wide share
38.7%
By region (daily share)
- NSW 29.4%
- VIC 34.2%
- QLD 34.3%
- SA 78.8%
- TAS 98.2%
FCAS
| Service | Cost | Spikes | Peak | When |
|---|---|---|---|---|
| RAISEREG | $8,064 | 0 | $16 | 14 May, 14:35 |
| LOWERREG | $1,669 | 0 | $6 | 14 May, 20:25 |
| RAISE60SEC | $315 | 0 | $0 | 14 May, 07:15 |
| RAISE6SEC | $273 | 0 | $0 | 14 May, 07:40 |
| LOWER60SEC | $130 | 0 | $1 | 14 May, 13:05 |
| RAISE5MIN | $71 | 0 | $0 | 14 May, 07:25 |
| LOWER5MIN | $41 | 0 | $0 | 14 May, 13:05 |
| LOWER6SEC | $40 | 0 | $0 | 14 May, 13:40 |
| Total | $10,602 | |||
Cost = NSW RRP × cleared MW per 5-min interval.
| Service | Cost | Spikes | Peak | When |
|---|---|---|---|---|
| LOWER6SEC | $12,128 | 0 | $8 | 14 May, 09:40 |
| LOWER60SEC | $12,101 | 0 | $9 | 14 May, 09:45 |
| RAISEREG | $8,798 | 0 | $16 | 14 May, 14:35 |
| LOWER5MIN | $2,878 | 0 | $2 | 14 May, 09:40 |
| LOWERREG | $2,682 | 0 | $6 | 14 May, 20:25 |
| RAISE6SEC | $443 | 0 | $0 | 14 May, 17:55 |
| RAISE60SEC | $269 | 0 | $0 | 14 May, 17:55 |
| RAISE5MIN | $75 | 0 | $0 | 14 May, 17:55 |
| Total | $39,374 | |||
Cost = QLD RRP × cleared MW per 5-min interval.
| Service | Cost | Spikes | Peak | When |
|---|---|---|---|---|
| RAISEREG | $20,733 | 0 | $16 | 14 May, 14:35 |
| LOWERREG | $3,684 | 0 | $6 | 14 May, 20:25 |
| RAISE60SEC | $572 | 0 | $0 | 14 May, 07:15 |
| RAISE6SEC | $474 | 0 | $0 | 14 May, 07:40 |
| LOWER60SEC | $288 | 0 | $1 | 14 May, 13:05 |
| RAISE5MIN | $146 | 0 | $0 | 14 May, 07:25 |
| LOWER5MIN | $64 | 0 | $0 | 14 May, 13:05 |
| LOWER6SEC | $49 | 0 | $0 | 14 May, 13:40 |
| Total | $26,009 | |||
Cost = VIC RRP × cleared MW per 5-min interval.
| Service | Cost | Spikes | Peak | When |
|---|---|---|---|---|
| RAISEREG | $6,328 | 0 | $16 | 14 May, 14:35 |
| LOWERREG | $3,088 | 0 | $6 | 14 May, 20:25 |
| RAISE6SEC | $176 | 0 | $0 | 14 May, 07:40 |
| RAISE60SEC | $161 | 0 | $0 | 14 May, 07:15 |
| LOWER60SEC | $133 | 0 | $1 | 14 May, 13:05 |
| LOWER5MIN | $36 | 0 | $0 | 14 May, 13:05 |
| LOWER6SEC | $36 | 0 | $0 | 14 May, 13:40 |
| RAISE5MIN | $28 | 0 | $0 | 14 May, 07:25 |
| Total | $9,987 | |||
Cost = SA RRP × cleared MW per 5-min interval.
| Service | Cost | Spikes | Peak | When |
|---|---|---|---|---|
| RAISEREG | $14,506 | 0 | $86 | 14 May, 07:30 |
| LOWER6SEC | $7,924 | 0 | $3 | 14 May, 08:55 |
| LOWERREG | $4,241 | 0 | $4 | 14 May, 19:25 |
| RAISE6SEC | $3,301 | 0 | $43 | 14 May, 17:55 |
| RAISE60SEC | $2,414 | 0 | $15 | 14 May, 07:05 |
| LOWER60SEC | $1,679 | 0 | $1 | 14 May, 08:00 |
| RAISE5MIN | $257 | 0 | $0 | 14 May, 04:05 |
| LOWER5MIN | $130 | 0 | $0 | 14 May, 08:55 |
| Total | $34,451 | |||
Cost = TAS RRP × cleared MW per 5-min interval.
Battery dispatch
Discharged
4,089MWh
peak 1,115 MW · 17:30
Charged
4,498MWh
peak 836 MW
Net
-409MWh
discharge − charge
Round-trip
91%
discharge / charge ratio
Discharged
3,982MWh
peak 1,232 MW · 17:30
Charged
5,018MWh
peak 948 MW
Net
-1,037MWh
discharge − charge
Round-trip
79%
discharge / charge ratio
Discharged
3,001MWh
peak 859 MW · 18:00
Charged
3,442MWh
peak 652 MW
Net
-441MWh
discharge − charge
Round-trip
87%
discharge / charge ratio
Discharged
1,082MWh
peak 386 MW · 18:30
Charged
1,353MWh
peak 363 MW
Net
-271MWh
discharge − charge
Round-trip
80%
discharge / charge ratio
NEM-wide
Discharged
12,154MWh
peak 3,368 MW · 17:30
Charged
14,311MWh
peak 1,966 MW
Net
-2,158MWh
discharge − charge
Round-trip
85%
discharge / charge ratio
Interconnectors
| Region (proxy) | Net flow | Direction changes | Hours at limit |
|---|---|---|---|
| N-Q-MNSP1 | +2.9 GWh | 23 | — |
| NSW1-QLD1 | −18.2 GWh | 20 | — |
| VIC1-NSW1 | +18.4 GWh | 20 | — |
| V-SA | +1.2 GWh | 26 | — |
| T-V-MNSP1 | −1.4 GWh | 0 | — |
Per-region net of NETINTERCHANGE proxied to a representative interconnector. Full per-interconnector decomposition + hours-at-limit needs DINTERCONNECTOR parsing (follow-up).
Emissions
Total emissions
321.7k tCO₂
▲ 11.0% vs same day last week
Intensity by region
| NSW | 110.9k tCO₂ | 0.552 tCO₂/MWh |
| QLD | 92.0k tCO₂ | 0.511 tCO₂/MWh |
| SA | 3.4k tCO₂ | 0.087 tCO₂/MWh |
| VIC | 115.2k tCO₂ | 0.730 tCO₂/MWh |
| TAS | 122 tCO₂ | 0.004 tCO₂/MWh |