NEM
POWER SYSTEM EVENTS
#146290
Non-credible contingency event - SA region - 12/11/2026
AEMO ELECTRICITY MARKET NOTICE. Non-credible contingency event - SA region - 12/11/2026 At 1422 hrs the Angas Creek - Mannum Tee MA_2 & MA_3 132 kV line and MA_2 and MA_3 Solar Farms tripped. AEMO did not instruct load shedding. AEMO has been advised disconnection of 28MW bulk electrical load. The cause of this non credible contingency event is not known at this stage. Manager NEM Real Time Operations